Dong Viet Bridge and approach road construction project, Yen Dung district, Bac Giang province.
Project level: Level I road and bridge traffic project.
At the project, Thuan An Group undertakes package 07: Construction of the entire Bac Giang shore span from pier M1 to pier T6 and the entire Hai Duong shore span from pier T8 to pier M2. Anchor pier T6, T8.
Construction of road surface and drainage from Km 4+420 - Km 5+220 (including intersection Km 4+594.39, excluding items: Median strip, traffic safety system).
Vinh Tuy Bridge Construction Investment Project - Phase 2
Construction level: Grade I road bridge.
At the project, Thuan An constructs package No. 02/VT2-XL: Construction of bridge section from pier 25 to pier 47.
Construction of the entire reinforced concrete and prestressed reinforced concrete bridge from span N26 to span N41.
North-South Expressway Project, Cam Lo - La Son section
Project level: Level I traffic project.
At the project, Thuan An Group participated in the construction of package XL10: Construction and survey, design of construction drawings for section Km 81+500 - Km 94+500 (including bridges: Khai Dinh, bridge No. 6, bridge No. 7, bridge Km88 - Km 88+987.07).
Project of different level intersection of Road No. 2, Southern Urban Area of Tuy Hoa City - Nguyen Van Linh Street
Construction level: Level II traffic.
At the project, Thuan An Group undertakes package No. 01EC: Survey, design construction drawings - estimate and construction of the entire project, including the main items:
- Cable-stayed overpass with Extradoes structure is permanently built with reinforced concrete and prestressed reinforced concrete.
- Up and down branch bridges.
Road section: Main street of the area, design speed 60km/h, for overpass branches, design speed is reduced by 30km/h.
Investment project to build Cua Hoi bridge across Lam River, Nghe An province and Ha Tinh province
Construction level: Grade II bridge and road.
At the project, Thuan An Group is in charge of constructing package XL.02: Construction of approach bridge (from pier T14 to pier M2 and upper structure of span N14, bridgehead road on Ha Tinh side).
Project to build an overpass at the intersection of An Duong and Thanh Nien streets
Construction level: Level II traffic, special level dike.
At the project, Thuan An Group is in charge of construction package No. 12: Construction and installation of reinforced concrete dykes, sidewalks, roads, drainage, trees, and traffic organization.