Close-up of the main gateway route to the capital, preparing to be renovated and expanded

Báo Tiền PhongBáo Tiền Phong05/12/2024

TPO - With a total length of about 3.7km connecting Duong Bridge and Tu Son City (Bac Ninh Province), the main gateway route of the Capital running through Yen Vien Town (Gia Lam District, Hanoi City) is preparing to be invested in and expanded to ensure traffic safety and order and reduce congestion.


TPO - With a total length of about 3.7km connecting Duong Bridge and Tu Son City (Bac Ninh Province), the main gateway route of the Capital running through Yen Vien Town (Gia Lam District, Hanoi City) is preparing to be invested in and expanded to ensure traffic safety and order and reduce congestion.

Close-up of the main gateway route to the capital, preparing to be renovated and expanded, photo 1

In recent years, Ha Huy Tap Street (Yen Vien town, Gia Lam district, Hanoi city) has often been overloaded with vehicles.

Close-up of the main gateway route to the capital, preparing to be renovated and expanded, photo 2

The surface of National Highway 1A passing through here is only about 8 to 10m wide, without a median strip, while receiving many trucks, containers... passing through every day.

Close-up of the main gateway route to the capital, preparing to be renovated and expanded, photo 3

National Highway 1A, from Duong Moi Bridge to Gia Lam District (currently Ha Huy Tap and Dang Phuc Thong streets) is the section connecting Hanoi with Bac Ninh province.

Close-up of the main gateway route to the capital, preparing to be renovated and expanded, photo 4

National Highway 1A through Gia Lam district has no median strip and narrow roadway.

Close-up of the main gateway route to the capital, preparing to be renovated and expanded, photo 5

Traffic congestion often occurs on this route, posing a potential risk to traffic safety due to changes in the road cross-section between Bac Ninh and Hanoi.

Close-up of the main gateway route to the capital, preparing to be renovated and expanded, photo 6

Meanwhile, National Highway 1A through Tu Son city (Bac Ninh province) has a cross-section of about 30m, accommodating 6 lanes.

Close-up of the main gateway route to the capital, preparing to be renovated and expanded, photo 7

Image of Ha Huy Tap street in Yen Vien town (Gia Lam district).

Close-up of the main gateway route to the capital, preparing to be renovated and expanded, photo 8

Previously, Vice Chairman of Hanoi People's Committee Duong Duc Tuan signed an official dispatch directing traffic organization to ensure traffic order and safety, reduce traffic congestion and propose investment policy for the project to renovate and upgrade National Highway 1A, from Duong Moi Bridge to the end of Gia Lam district.

Close-up of the main gateway route to the capital, preparing to be renovated and expanded, photo 9

To completely resolve traffic congestion and invest in completing the planned route, the Hanoi People's Committee assigned the Department of Transport to preside over and coordinate with the City Police and relevant units to study and immediately implement a plan to organize traffic, regulate and separate traffic flows to ensure traffic order and safety, and avoid traffic congestion in the above-mentioned area.

Close-up of the main gateway route to the capital, preparing to be renovated and expanded, photo 10

Accordingly, the Department of Planning and Investment is assigned to urgently review and update the investment project of National Highway 1A, the section from Duong New Bridge to the end of Gia Lam district mentioned above, into the city's medium-term public investment plan for 2021-2025, and report to the City People's Committee.

Close-up of the main gateway route to the capital, preparing to be renovated and expanded, photo 11Close-up of the main gateway route to the capital, preparing to be renovated and expanded, photo 12

Images of container trucks and other vehicles running continuously on this route.

Close-up of the main gateway route to the capital, preparing to be renovated and expanded, photo 13

Traffic jams often occur on the road when oversized vehicles appear.

Close-up of the main gateway route to the capital, preparing to be renovated and expanded, photo 14

The railway cuts across National Highway 1A through Gia Lam district.

Close-up of the main gateway route to the capital, preparing to be renovated and expanded, photo 15

After being upgraded and renovated along with the completion of the Duong bridge complex, this route is expected to strongly connect Bac Ninh's industrial clusters with the central area of ​​Hanoi.

Hoang Manh Thang



Source: https://tienphong.vn/can-canh-tuyen-duong-huet-mach-cua-ngo-thu-do-chuan-bi-duoc-cai-tao-mo-rong-post1697583.tpo

Comment (0)

No data
No data

Same tag

Same category

Same author

Figure

French father brings daughter back to Vietnam to find mother: Unbelievable DNA results after 1 day
Can Tho in my eyes
17-second video of Mang Den so beautiful that netizens suspect it was edited
The primetime beauty caused a stir because of her role as a 10th grade girl who is too pretty even though she is only 1m53 tall.

No videos available