TPO - The Red River water level exceeded alert level 2, causing the entire area of Phuc Tan, Bach Dang (Hoan Kiem and Hai Ba Trung districts), Phuc Xa (Ba Dinh district) to be deeply flooded and power cut. People cleaned up valuable belongings and evacuated on the morning of September 11.
The water level of the Red River at Long Bien Bridge at 8:40 am on September 11 was 10.99m, 51cm below alert level III. At present, some streets in Phuc Tan ward such as Bao Linh, Phuc Tan... (Hoan Kiem district) are deeply flooded, with some places flooded up to 80cm. |
The entire flooded area has been cut off from electricity. People have evacuated the elderly and children to relatives' homes for temporary shelter. |
Ms. Ngan (a resident of Phuc Tan Street) said that her family has been staying at a relative's house in the Old Quarter since September 10. She and her husband are packing more furniture to move out of the house for a while. |
On Bach Dang Street (Chuong Duong Ward, Hoan Kiem District), many areas are deeply flooded. The electricity has been cut off to ensure safety. |
The odd-numbered alleys on Bach Dang Street (on the riverside) have places where the water is up to a meter deep. |
Due to the lack of electricity and inconvenience in daily life, many families have chosen to evacuate to the city to temporarily stay. Some families have rented hotels to stay. |
People find every way to overcome the historic flood. |
Some households choose to stay at home and rent generators for daily use. |
In Bach Dang ward, on the night of September 10, district leaders came to inspect and direct flood control posts in the ward. |
Ms. Quach Ngoc Thuy, Secretary of Bach Dang Ward, said that many areas in the ward are currently deeply flooded. On the night of September 10, Bach Dang Ward evacuated 103/250 households near the riverbank. "Before 5 p.m. this afternoon, authorities will evacuate the remaining households to ensure the safety of people's lives and property," said Ms. Thuy. |
On Bach Dang Street, traditional markets are still operating. |
Many flooded areas on Bach Dang, Van Kiep, Van Don streets... caused traffic difficulties. |
Valuable assets were transported by boat out of the flooded area by people. |
Mr. T (living in lane 193 Bach Dang) said that his family had built many sandbags to block the water and mobilized many people to scoop the water out. But last night and this morning the flood rose so quickly that the entire first floor was submerged in water. |
Source: https://tienphong.vn/ha-noi-mat-dien-ngap-sau-hang-tram-dan-ngoai-de-di-tan-post1672003.tpo
Comment (0)