Vietnam.vn - Nền tảng quảng bá Việt Nam

Close-up of 2 roads in Long Bien district preparing to be expanded to 4 lanes

Báo Tiền PhongBáo Tiền Phong12/06/2024


TPO - Recently, the Hanoi People's Committee approved the location plan for two roads with a total length of more than 1.2km and 4 lanes in Long Bien district, connecting the district center with the newly developed urban area adjacent to the Red River.

Close-up of 2 roads in Long Bien district preparing to be expanded to 4 lanes photo 1

Accordingly, the planned route location plan was prepared by the Hanoi Institute of Construction Planning and appraised by the Hanoi Department of Planning and Architecture.

Close-up of 2 roads in Long Bien district preparing to be expanded to 4 lanes photo 2

The routes passing through Thuong Thanh, Gia Thuy, Ngoc Lam wards, Long Bien district, Hanoi city, are determined to be in accordance with the N10 urban zoning plan, scale 1/2000 approved by the City People's Committee.

Close-up of 2 roads in Long Bien district preparing to be expanded to 4 lanes photo 3

Specifically, route 1 has its starting point at the intersection of Ngo Gia Kham - Ngoc Lam; The end point intersects with the routes in the Urban Functional Area on both sides of the route from Ngoc Thuy embankment to Thuong Thanh New Urban Area; the total length of the route is about 1,020m.

Close-up of 2 roads in Long Bien district preparing to be expanded to 4 lanes photo 4

Ngo Gia Kham Street is adjacent to Nguyen Van Cu Street at one end and Ngoc Lam Street at the other end. There are currently 2 mixed lanes.

Close-up of 2 roads in Long Bien district preparing to be expanded to 4 lanes photo 5

This road has Gia Lam bus station so traffic is often overloaded.

Close-up of 2 roads in Long Bien district preparing to be expanded to 4 lanes photo 6
Close-up of 2 roads in Long Bien district preparing to be expanded to 4 lanes photo 7

Route 2 starts at the intersection with Route 1. The end point intersects with the roads in the Technical Infrastructure Construction Land of planning blocks A4/NO2, A4/NO5, A4/HH1, A4/HH5 serving the auction of land use rights in Ngoc Thuy ward; the total length of the route is about 290m.

Close-up of 2 roads in Long Bien district preparing to be expanded to 4 lanes photo 8

The two routes have a cross-section width of 30m, of which the roadway is 15m wide (4 lanes); the sidewalks on both sides are 2x7.5m wide.

Close-up of 2 roads in Long Bien district preparing to be expanded to 4 lanes photo 9
Close-up of 2 roads in Long Bien district preparing to be expanded to 4 lanes photo 10

The Ngo Gia Kham Street expansion project will connect wards in Long Bien district with a relatively complete traffic system.

Close-up of 2 roads in Long Bien district preparing to be expanded to 4 lanes photo 11

The cleared sections and the initial shape of the route have gradually emerged.

Close-up of 2 roads in Long Bien district preparing to be expanded to 4 lanes photo 12Close-up of 2 roads in Long Bien district preparing to be expanded to 4 lanes photo 13

The project will intersect the railway near Gia Lam station.

Close-up of 2 roads in Long Bien district preparing to be expanded to 4 lanes photo 14

Once completed, the project will connect the routes passing through Thuong Thanh, Gia Thuy, Ngoc Lam wards, Long Bien district.

Hoang Manh Thang



Source: https://tienphong.vn/can-canh-2-tuyen-duong-o-quan-long-bien-chuan-bi-duoc-dau-tu-mo-rong-len-4-lan-xe-post1645690.tpo

Comment (0)

No data
No data

Same tag

Same category

Son Doong Cave is among the top 'surreal' destinations like on another planet
Wind power field in Ninh Thuan: Check-in "coordinates" for summer hearts
Legend of Father Elephant Rock and Mother Elephant Rock in Dak Lak
View of Nha Trang beach city from above

Same author

Heritage

Figure

Business

No videos available

News

Political System

Local

Product