The case of the abandoned 13 billion school in Dong Nai: Requesting to handle the responsibility of organizations and individuals

Báo Tuổi TrẻBáo Tuổi Trẻ30/11/2024

Dong Nai province leaders have just requested to handle the responsibility of organizations and individuals in the case of the 13 billion VND school construction in Nhon Trach district that has deteriorated.


Vụ trường học 13 tỉ ở Đồng Nai bỏ hoang: Yêu cầu xử lý trách nhiệm các tổ chức, cá nhân - Ảnh 1.

Duong Van Thi Secondary School in Dong Nai cost more than 13 billion VND to build but is degraded, students have had to be transferred to another school to study temporarily for many years - Photo: A LOC

On November 30, news from the Dong Nai Provincial People's Committee said that Chairman of the Dong Nai Provincial People's Committee Vo Tan Duc has just signed a document requesting the Department of Construction to coordinate with relevant units to organize the implementation of the inspection conclusion of the construction of Duong Van Thi Secondary School in Phu Huu Commune, Nhon Trach District.

At the same time, coordinate with the Department of Home Affairs to propose handling the responsibilities of organizations and individuals related to the construction of Duong Van Thi School.

Used for several years and then abandoned.

Previously, the Inspectorate of the Department of Construction had concluded the Duong Van Thi School project. This is a project invested by the Department of Education and Training of Dong Nai province; the project management unit is the Dong Nai Civil and Industrial Construction Project Management Board; the construction unit is a joint venture of Tan Binh Minh Company Limited and Construction Company No. 5 (located in Dong Nai).

According to the conclusion, after two adjustments to the investment project, the total investment capital of the above school project is over 13 billion VND. In early 2008, Duong Van Thi Secondary School was put into use.

Vụ trường học 13 tỉ ở Đồng Nai bỏ hoang: Yêu cầu xử lý trách nhiệm các tổ chức, cá nhân - Ảnh 2.

Working group of Dong Nai Provincial People's Council went to supervise the quality of the project - Photo: A LOC

The school was in regular use until 2013.

In the period of 2014-2016, the project began to show signs of serious deterioration: the concrete beam system showed signs of oxidation, the concrete columns were cracked and leaking. The toilet system leaked, the walls were severely damaged and unusable, the brick floor collapsed, the drainage system was often clogged causing flooding when it rained. Therefore, the project continued to be maintained and repaired twice with a total cost of more than 1.4 billion VND from the budget.

By December 2021, the building was severely degraded, with cracks appearing at the base of the columns, posing a danger to the safety of students and teachers. Therefore, the People's Committee of Nhon Trach District requested that the school's students be relocated to a temporary primary school to study at.

Abandoned due to serious degradation

According to the inspection conclusion, the school construction inspection agency recommended that the investor should consider "the option of dismantling and rebuilding the project to ensure the long-term life of the project and achieve high economic efficiency".

In addition, the inspection agency also determined that "the load-bearing capacity of a structural component cannot meet the requirements of normal use, and a locally dangerous situation appears."

Vụ trường học 13 tỉ ở Đồng Nai bỏ hoang: Yêu cầu xử lý trách nhiệm các tổ chức, cá nhân - Ảnh 3.

One of many degraded school items - Photo: A LOC

The inspector also stated that the results of the inspection of the current status of the school recorded signs of deterioration in some construction items, most of the corridor columns had broken protective concrete layers, some columns had exposed steel reinforcement, and there were signs of rotten bricks...

The Inspectorate of the Department of Construction concluded that the responsibility for the errors in the construction of the above project belongs to the Department of Education and Training of Dong Nai province, the Project Management Board of the specialized education sector; PHA Construction Design Consulting Company Limited (the unit that surveyed the terrain, prepared construction drawings - estimates); Thanh Cuong Construction Design Consulting Company (geological survey); Mien Dong Construction Consulting Company Limited (appraisal, approval of construction drawing design - estimates) and the construction unit is a joint venture of Tan Binh Minh Company and Construction Company No. 5; Dong Nai Construction Association Construction Consulting Company Limited.

Vụ trường học 13 tỉ ở Đồng Nai bỏ hoang: Yêu cầu xử lý trách nhiệm các tổ chức, cá nhân - Ảnh 4.

The school has been degraded for many years, abandoned, causing waste of budget - Photo: A LOC

Talking to Tuoi Tre Online about how to handle the above school, Mr. Nguyen The Phong, Chairman of Nhon Trach District People's Committee, said that with the conclusion that the quality of the construction did not ensure safety for students, the district chose the option of dismantling the entire old Duong Van Thi Secondary School to build a new one.

If approved by the Provincial People's Committee, in 2025 the district will prepare documents and register capital so that in 2026 it can build a new school.



Source: https://tuoitre.vn/vu-truong-hoc-13-ti-o-dong-nai-bo-hoang-yeu-cau-xu-ly-trach-nhiem-cac-to-chuc-ca-nhan-20241130084229725.htm

Comment (0)

No data
No data

Same tag

Same category

Vietnam calls for peaceful resolution of conflict in Ukraine
Developing community tourism in Ha Giang: When endogenous culture acts as an economic "lever"
French father brings daughter back to Vietnam to find mother: Unbelievable DNA results after 1 day
Can Tho in my eyes

Same author

Image

Heritage

Figure

Business

No videos available

News

Ministry - Branch

Local

Product