The project aims to establish facilities and invest in synchronous equipment to ensure the requirements of medical examination and treatment of the specialized hospital according to its assigned functions and tasks. After completion, the hospital bed scale will reach 250 beds.
This is a group B project, a level II project; the term of use is not less than 50 years, invested by the Hanoi Civil Construction Investment Project Management Board.
In which, build a new main building with 9 floors above ground (not including the elevator shaft and technical floor) and 1 basement; build new auxiliary works including main gate, secondary gate, security guard house, fence, technical infrastructure auxiliary area (power station, generator, medical gas station, wastewater and waste treatment station, specialized parking...).
The project also invests in technical infrastructure works including: leveling, internal roads, water supply and drainage outside the house, medium and low voltage power supply, lighting, trees, landscape, outdoor fire protection system, medical gas system, clean gas, information technology, nurse call, camera, wastewater treatment...
The City People's Committee assigned the investor - Hanoi Civil Construction Investment Project Management Board to be responsible before the law for the accuracy of volume, cost; structural calculation results and legality of the documents submitted for approval; capacity of organizations and individuals conducting surveys and project preparation.
The investor is responsible for researching and reviewing the technical infrastructure system of the area, updating the technical infrastructure connection plan to ensure savings, efficiency, economic and technical optimization, and the ability to operate synchronously between the technical infrastructure inside and outside the project.
Along with that, the investor continues to check, review, absorb and complete the appraisal opinions of relevant agencies on the investment project and the noted contents in the appraisal result notification document of the Department of Construction.
The investor manages construction investment costs in accordance with the provisions of Decree No. 10/2021/ND-CP of the Government and current regulations. On the other hand, the investor manages the project and selects contractors in accordance with the regulations of the State and Hanoi City; reports on investment monitoring and evaluation and coordinates community monitoring according to regulations.
In addition, the City People's Committee assigned the Department of Health to be responsible for the project's objectives and investment efficiency in accordance with the investment policy approved in Resolution No. 14/NQ-HDND of the City People's Council; to guide the investor and Hanoi Eye Hospital in selecting equipment in accordance with industry standards and norms, investment objectives and implementing other contents of the project.
Source: https://kinhtedothi.vn/phe-duyet-du-an-dau-tu-xay-dung-moi-benh-vien-mat-ha-noi.html
Comment (0)