The Hanoi People's Committee has just approved the investment project to build a road connecting the road to Nam Thang Long Industrial Park to Ring Road 3.5 in Bac Tu Liem District.
The route has a total length of about 4km. The starting point of the route intersects with Ring Road 3.5, in Thuong Cat ward, Bac Tu Liem district.
The end point of the route intersects with the road to Nam Thang Long Industrial Park, in Thuy Phuong ward, Bac Tu Liem district.
Completing the route will help make Ring Road 3.5 more closed. Illustration photo.
This is an inter-regional route, designed speed 60km/h; Cross-section size 40m; The section connecting to Ring Road 3.5 has a cross-section width of 40m.
The total construction investment is over 780 billion VND, of which the City budget allocates about 547 billion VND, and the Bac Tu Liem district budget allocates about 263 billion VND. The project is expected to be implemented in 2 years (2025-2026).
Source: https://www.baogiaothong.vn/ha-noi-sap-dau-tu-780-ti-dong-lam-tuyen-duong-rong-40m-19225030121161232.htm
Comment (0)