
According to the Department of Transport, during the bridge repair period, vehicles traveling from Hoi An city center to Cua Dai beach and vice versa can travel along Vo Chi Cong street (DT.619) across De Vong bridge, then turn right onto Lac Long Quan street (DT.603B). Motorbikes, non-motorized vehicles, and pedestrians traveling across the bridge must follow the instructions of traffic controllers to ensure safety and ensure the quality of the project.

The Department of Transport also requires that within the scope of the construction repair, the construction unit must arrange barriers and warning signs; at both ends of the temporarily closed section, notice signs and direction signs must be installed and guards must be assigned to direct traffic. The Quang Nam Transport Inspectorate will coordinate with functional forces to regularly inspect the implementation of the traffic organization plan and ensure traffic safety on the section under construction.
Source: https://baoquangnam.vn/cam-o-to-qua-cau-phuoc-trach-tp-hoi-an-tu-27-9-5-10-2024-3141772.html
Comment (0)