Vietnam.vn - Nền tảng quảng bá Việt Nam

Another bridge in Yen Bai is closed for repairs

Báo Tiền PhongBáo Tiền Phong31/10/2024

TPO - According to the leader of the Department of Transport of Yen Bai province, due to the deterioration of the roadbed and surface, which is not safe, the unit has issued a notice to divert traffic to conduct inspection, maintenance and repair.


TPO - According to the leader of the Department of Transport of Yen Bai province, due to the deterioration of the roadbed and surface, which is not safe, the unit has issued a notice to divert traffic to conduct inspection, maintenance and repair.

Another bridge in Yen Bai is closed for repairs photo 2Another bridge in Yen Bai is closed for repairs photo 3

According to the Director of the Department of Transport of Yen Bai province, traffic diversion will start from 00:00 on November 1, 2024 to December 29, 2024 to serve the repair of Van Phu bridge.

Another bridge in Yen Bai is closed for repairs photo 4

During the time the units are constructing the bridge, people and vehicles will be prohibited from moving across the bridge to repair the roadbed and road surface and to inspect and maintain the bridge piers affected by floods.

Another bridge in Yen Bai is closed for repairs photo 5Another bridge in Yen Bai is closed for repairs photo 6

Immediately after issuing the document, the unit installed signs to guide traffic flow for people and vehicles at the intersection on both sides of the bridge.

Another bridge in Yen Bai is closed for repairs photo 7Another bridge in Yen Bai is closed for repairs photo 8Another bridge in Yen Bai is closed for repairs photo 9
Specifically, vehicles and people traveling to the Van Phu Bridgehead Intersection (the intersection has traffic lights) enter Yen Bai - Van Tien Street to the intersection with the three-bridge connecting road, turn left to enter the three-bridge connecting road to the intersection at the Gioi Phien Bridgehead, turn left to cross Gioi Phien Bridge, enter National Highway 32C or the road connecting National Highway 32C with Noi Bai - Lao Cai Expressway to Au Co Street (and vice versa).
Another bridge in Yen Bai is closed for repairs photo 10

Mr. Tran Viet Dung - Director of the Department of Transport of Yen Bai province added that in addition to traffic diversion to repair Van Phu bridge, some other bridges in the province such as Rao bridge and Gua bridge on Au Lau - Dong An road (provincial road 166), Mau A bridge on Mau A road to Tan Nguyen (provincial road 165) are also being maintained and repaired by units.

Another bridge in Yen Bai is closed for repairs photo 11Another bridge in Yen Bai is closed for repairs photo 12

Previously, on October 3, the Department of Transport of Yen Bai province issued an official dispatch prohibiting all people and vehicles from traveling through Yen Bai bridge to inspect safety, maintain and repair the bridge.

Close-up of the Yen Bai bridge's pillars and girders being pushed and eroded
Close-up of the Yen Bai bridge's pillars and girders being pushed and eroded

Rising water, people and vehicles are prohibited from crossing Yen Bai bridge
Rising water, people and vehicles are prohibited from crossing Yen Bai bridge

Closing of the bridge over 100 billion VND across Chay River
Closing of the bridge over 100 billion VND across Chay River

Van Duc



Source: https://tienphong.vn/them-mot-cay-cau-o-yen-bai-bi-cam-luu-thong-de-sua-chua-post1687351.tpo

Comment (0)

No data
No data

Same tag

Same category

Young people "revive" historical images
Close-up of the soldiers' hard training hours before the April 30th celebration
Ho Chi Minh City: Coffee shops decorated with flags and flowers to celebrate the 30/4 holiday
36 military and police units practice for April 30th parade

Same author

Heritage

Figure

Business

No videos available

News

Political System

Local

Product