Deputy Prime Minister Nguyen Chi Dung and leaders of Binh Dinh province, delegates cut the ribbon to inaugurate the road connecting National Highway 19 with Becamex VSIP Binh Dinh Industrial Park - Photo: NGOC QUYEN
Reporting at the inauguration ceremony, Mr. Nguyen Tu Cong Hoang - Vice Chairman of Binh Dinh Provincial People's Committee - said that the inauguration of this route has created a smooth connection from Quy Nhon port to the aforementioned dynamic industrial park.
This route not only meets the needs of travel and freight transport but also creates momentum to promote the socio-economic development of Binh Dinh.
According to the report, the route connecting from National Highway 19 (Nhon Tan Commune, An Nhon Town, Binh Dinh) to Becamex VSIP Binh Dinh Industrial Park (Canh Vinh Commune, Van Canh District, Binh Dinh) is nearly 19.5km long, with an 11m wide asphalt concrete road surface with 2 lanes for motor vehicles and 2 lanes for rudimentary vehicles.
The project has a total investment of more than 1,170 billion VND, of which the central budget supports 800 billion VND, the rest from the local budget.
This route was started in August 2023, and now it was inaugurated 5 months ahead of the original plan. The route has helped shorten the distance from National Highway 19 to the center of Becamex VSIP Binh Dinh Industrial Park from 31.5km to 16.5km.
The road has an 11m wide asphalt concrete surface, ensuring 2 lanes for motor vehicles and 2 lanes for non-motorized vehicles - Photo: HY
Speaking at the ceremony, Deputy Prime Minister Nguyen Chi Dung emphasized that the project is not only important for the development of Binh Dinh province, but also plays a strategic role in connecting regions, creating momentum for socio-economic development for the South Central and Central Highlands regions.
The Deputy Prime Minister suggested that Binh Dinh province continue to effectively exploit the route, promote investment attraction in Becamex VSIP Binh Dinh Industrial Park, and focus on developing industries and logistics services to maximize the advantage of connecting with Quy Nhon port and the Central Highlands provinces.
Completed flood drainage project for Quy Nhon
Also this afternoon, Binh Dinh province inaugurated the Dinh River flood drainage system (in Nhon Binh and Nhon Phu wards, Quy Nhon city), with an investment of 316.5 billion VND from the local budget.
The project has expanded and dredged the riverbed, built embankments to reinforce the riverbank, combined with building a traffic road along the entire route of more than 6km, expanded the span of Cho Dinh bridge from 24m to 45m, built a 6.3km long surface drainage system, and a 6.4km long underground lighting system.
Mr. Nguyen Tuan Thanh - Standing Vice Chairman of Binh Dinh Provincial People's Committee - said that the project not only helps protect Quy Nhon urban area from floods but also creates a premise for synchronous infrastructure development, attracting investment, and improving people's quality of life.
Source: https://tuoitre.vn/khanh-thanh-duong-1-170-ti-dong-noi-cang-quy-nhon-voi-khu-cong-nghiep-becamex-binh-dinh-20250327172305692.htm
Comment (0)