Accordingly, the construction area is 457.4 m2 , the total floor area is about 1,730 m2 with 4 floors. The first floor is the motorbike parking area, lobby, stairs, duty room, 2 emergency stairs, 3 technical rooms, and restrooms. The second floor has open space and stairs, waiting room, ticket counter, drinks, technical room, 2 emergency stairs, and restrooms. The third floor has screening room 1 with 131 seats and a projector room, a VIP screening room with 44 seats, a technical room, 2 emergency stairs, and restrooms. The fourth floor has screening room 2 with 180 seats, 3 working rooms, a technical room, 2 emergency stairs, and restrooms.
For the stairs up and down, the Department of Culture, Sports and Tourism and the sponsor proposed two design options. These are the rectangular-shaped architectural stairs and the circular-shaped architectural stairs.
In order to have a basis for early construction of Thong Nhat Cinema, the Department of Culture, Sports and Tourism requests relevant agencies and units according to their functions and tasks to guide the implementation before August 15.
The old Thong Nhat Cinema at 28 Ho Chi Minh Avenue has a total area of 783m2 and was built in 1960 and is managed by the Cultural and Arts Center under the Department of Culture, Sports and Tourism of Hai Duong province. The building has seriously deteriorated, is at risk of collapse and has been temporarily closed since 2005.
Source: https://baohaiduong.vn/vingroup-tai-tro-xay-rap-phim-thong-nhat-tp-hai-duong-389413.html
Comment (0)