Metro Line 1 welcomes 150,000 passengers on first day of operation

Báo Nhân dânBáo Nhân dân24/12/2024

NDO - On the afternoon of December 23, the Ho Chi Minh City Urban Railway Project Management Board and Urban Railway One Member Limited Liability Company No. 1 (HURC1) held a press conference after the first official operation day of Metro Line No. 1 Ben Thanh-Suoi Tien.
On the first day of operation, Ho Chi Minh City metro line No. 1 (Ben Thanh - Suoi Tien) welcomed 150,000 passengers.
On the first day of operation, Ho Chi Minh City metro line No. 1 (Ben Thanh - Suoi Tien) welcomed 150,000 passengers.
According to statistics from the operating unit, on the first day of operation, Ho Chi Minh City Metro Line 1 (Ben Thanh - Suoi Tien) welcomed 150,000 passengers, nearly 6 times higher than the initial estimate of 27,000 passengers.
Metro Line 1 first day of operation welcomed 150,000 passengers photo 1
150,000 people experienced Ho Chi Minh City Metro Line 1 on the first day of operation.
Mr. Le Minh Triet, Director of Urban Railway One Member Limited Liability Company No. 1 (HURC1) said that on the first day of operation (from 10:00 to 22:00), there were 177 Metro trains operating to serve about 150,000 passengers to experience. This number far exceeded (nearly 6 times) the initial expected number of passengers (27,000 passengers).
Metro Line 1 first day of operation welcomed 150,000 passengers photo 2
Mr. Le Minh Triet, Director of Urban Railway One Member Limited Liability Company No. 1 (HURC1) shared information.
“150,000 passengers is a very large number, this is a positive signal, a sign of improvement for public transport in the near future”. On the second day of commercial operation of the Metro line, the operator of the line said that from 5am to 4pm, there were 124 trains running, serving about 14,000 passengers. Also according to the representative of the Urban Railway One Member Limited Liability Company No. 1, people started going to school and work by Metro today. Passengers have started using Metro to travel from the city center to the new Eastern Bus Station in Thu Duc and vice versa. This shows that Metro is gradually serving the new Eastern Bus Station, gradually solving the transportation needs of the city's people, contributing to solving traffic congestion.
Metro Line 1 first day of operation welcomed 150,000 passengers photo 3
Ceremony scene.
A representative of the line operator said that according to the order plan and timetable provided by the Ho Chi Minh City Department of Transport, it is estimated that Metro Line 1 will welcome about 40,000 passengers/day. Therefore, the unit expects that after a short time, Metro will form new travel habits for people. Currently, for the utilities around the stations, the company has also cooperated with the Public Transport Management Center to connect vehicles, helping passengers travel most conveniently. As planned, during the New Year, the company will increase the frequency of operations of the Metro line; at the same time, it will coordinate with security forces to ensure security and order at the stations.

Nhandan.vn

Source: https://nhandan.vn/ngay-dau-van-hanh-tuyen-metro-so-1-don-150000-khach-post852151.html

Comment (0)

No data
No data

Same tag

Same category

Same author

Figure

French father brings daughter back to Vietnam to find mother: Unbelievable DNA results after 1 day
Can Tho in my eyes
17-second video of Mang Den so beautiful that netizens suspect it was edited
The primetime beauty caused a stir because of her role as a 10th grade girl who is too pretty even though she is only 1m53 tall.

No videos available