Vietnam.vn - Nền tảng quảng bá Việt Nam

Submitting to the Prime Minister the planning of Con Dao Airport in the second quarter of 2025

Báo Giao thôngBáo Giao thông09/01/2025

Deputy Prime Minister Tran Hong Ha assigned the Ministry of Transport and the People's Committee of Ba Ria - Vung Tau province to study and plan Con Dao Airport for the 2021-2030 period, with a vision to 2050, and submit it to the Prime Minister in the second quarter of 2025.


Commenting on the investment plan for Con Dao Airport, Deputy Prime Minister Tran Hong Ha agreed with the report and proposal of the People's Committee of Ba Ria - Vung Tau province on the investment plan for Con Dao Airport.

The Deputy Prime Minister assigned the Ministry of Transport and the People's Committee of Ba Ria - Vung Tau province to study and plan Con Dao Airport for the 2021-2030 period, with a vision to 2050, and carry out steps in accordance with legal regulations, and submit it to the Prime Minister in the second quarter of 2025.

Trình Thủ tướng quy hoạch Cảng hàng không Côn Đảo trong quý II/2025- Ảnh 1.

Con Dao Airport.

Previously, the People's Committee of Ba Ria - Vung Tau province proposed to study the planning, investment and expansion plan for Con Dao Airport to ensure it meets international airport standards under the PPP method, and to make overall investment in the entire project, including airport facilities, facilities to ensure flight operations, essential civil aviation facilities, and aviation service facilities, to be able to receive large, wide-body aircraft such as A320, A321, Airbus A350, and Boeing 787.

According to the Master Plan for the development of the national airport system for the period 2021-2030, with a vision to 2050, Con Dao Airport is planned for the period up to 2030 with a capacity of about 2 million passengers/year, and a vision to 2050 with a capacity of about 3 million passengers/year.

Currently, the runway and taxiway at Con Dao airport have degraded and have poor load-bearing capacity, due to being built in 2004. The 30m wide runway does not meet the standards for operating code C aircraft, and can only accommodate aircraft such as the ATR72 and equivalent (Embraer E190/E195 with reduced load).



Source: https://www.baogiaothong.vn/trinh-thu-tuong-quy-hoach-cang-hang-khong-con-dao-trong-quy-ii-2025-192250109171747539.htm

Comment (0)

No data
No data

Same tag

Same category

Wind power field in Ninh Thuan: Check-in "coordinates" for summer hearts
Legend of Father Elephant Rock and Mother Elephant Rock in Dak Lak
View of Nha Trang beach city from above
Check-in point of Ea H'leo wind farm, Dak Lak causes a storm on the internet

Same author

Heritage

Figure

Business

No videos available

News

Political System

Local

Product