Vietnam.vn - Nền tảng quảng bá Việt Nam

Strengthening traffic safety on highways during Tet

Việt NamViệt Nam06/01/2025


Currently, Vietnam Expressway Corporation (VEC) is managing and operating expressways nationwide including: Noi Bai - Lao Cai, Cau Gie - Ninh Binh, Da Nang - Quang Ngai, Ho Chi Minh City - Long Thanh - Dau Giay.

VEC requires management and operation units to closely coordinate with functional forces on the route and localities where the expressway passes through to ensure traffic order and safety, promptly handle incidents (if any) to ensure smooth traffic.

Thoroughly handle vehicles parked illegally, motorbikes, pedestrians entering the highway. Especially the situation of motorbike taxis picking up passengers at the branches entering and exiting toll stations.

VEC also requires units to carry out the work of clearing and removing trees along both sides of the highway corridor that are at risk of falling, tree branches that obscure the view of markers, signs, cleaning signs, reflective systems, etc. to ensure safe visibility for vehicles traveling on the route.

Lao Cai 1.jpg
VEC requires units to ensure traffic safety on expressways during the 2025 Tet peak season. Photo: NB

Clean the road surface and sidewalks, ensure that the road surface areas on the bridge before and after the toll station area are clean and aesthetically pleasing.

Absolutely comply with traffic safety and labor safety measures when performing tasks on the route.

In addition, VEC also requires the operating unit to stop construction with contractors and units that do not properly implement approved traffic safety measures.

In particular, units need to develop plans to ensure traffic safety and order, prevent traffic congestion, and assign staff to be on-site to handle any problems that arise on highways during Tet.

Lao Cai 2 _ Anh BN.jpg
Organize traffic flow when there is an incident, not to interrupt toll collection activities on VEC's highways. Photo: NB

Regarding toll collection activities on expressways, VEC requires Tasco Joint Stock Company to develop a plan to ensure traffic safety and prevent congestion at toll stations during peak periods before, during and after the Lunar New Year 2025; Proactively review and fix existing problems in the operation of the toll collection system, if any.

Arrange technical staff on duty 24/7 at toll stations on the highway to promptly handle situations and technical problems that may occur with the toll collection system.

Handle lane incidents quickly, ensuring no traffic congestion or jams in toll lanes.

Absolutely ensure traffic safety and labor safety during toll collection operations.

Coordinate with the forces on duty on the route and the functional forces in ensuring traffic safety and security and order at the toll station area. Do not allow motorbike taxis to pick up and drop off passengers before and after the toll station area.

Promptly respond and resolve customer complaints upon receipt of feedback.

Bich Dao

Source: https://vietnamnet.vn/tang-cuong-dam-bao-an-toan-giao-thong-dip-tet-tren-duong-cao-toc-2360623.html


Comment (0)

No data
No data

Same tag

Same category

Spectacular start of Vietnamese film market in 2025
Phan Dinh Tung releases new song before concert 'Anh trai vu ngan cong gai'
Hue National Tourism Year - 2025 with the theme "Hue - Ancient Capital - New Opportunities"
Army determined to practice parade 'most evenly, best, most beautiful'

Same author

Heritage

Figure

Business

No videos available

News

Political System

Local

Product