Current status of social housing projects causes people to compete for 150 purchase slots in Hanoi

Người Đưa TinNgười Đưa Tin14/08/2024


NHS Trung Van social housing project has a prime location on To Huu Street, Trung Van Ward, Nam Tu Liem District, Hanoi City, invested by the Joint Venture of NHS Construction Investment Joint Stock Company and Construction Investment Joint Stock Company No. 4.

The project is located on To Huu Street (Le Van Luong extension), about 200m from Trung Van People's Committee headquarters, at land lot HH02A, belonging to the Southeast housing group project of To Huu Street.

NHS Trung Van has an area of ​​about 2,726m2, construction time from the second quarter of 2022 and is expected to be completed in the second quarter of 2024.

The project scale includes 3 apartment buildings and 48 townhouses; including 1 social housing building with 32 floors, 2 basements and 2 commercial apartment buildings. According to the investor, there are 275 apartments including: 68 rental apartments, 157 purchased apartments and 50 commercial apartments, with a population of nearly 600 people.

According to Nguoi Dua Tin, the project has now completed the rough construction, and workers are finishing the exterior painting of the building.

As a project with great appeal to the capital's residents in 2023, about 1,500 people lined up to draw lots to buy 150 units. The current house price is twice as high as the starting price.

Hiện trạng dự án nhà ở xã hội khiến người dân tranh 150 suất mua ở Hà Nội- Ảnh 1.

Trung Van social housing project has a scale of 3 apartment buildings and 48 townhouses; including 1 social housing building with 32 floors, 2 basements and 2 commercial apartment buildings. According to the investor, there are 275 apartments including: 68 rental apartments, 157 purchased apartments and 50 commercial apartments, with a population of nearly 600 people.

Hiện trạng dự án nhà ở xã hội khiến người dân tranh 150 suất mua ở Hà Nội- Ảnh 2.

The investor of the NHS Trung Van social housing project is a joint venture between NHS Construction Investment Joint Stock Company and Construction Investment Joint Stock Company No. 4. NHS Trung Van has an area of ​​about 2,726 m2, construction time from the second quarter of 2022 and is expected to be completed in the second quarter of 2024.

Hiện trạng dự án nhà ở xã hội khiến người dân tranh 150 suất mua ở Hà Nội- Ảnh 3.

According to Nguoi Dua Tin, the project is now entering the final stage.

Hiện trạng dự án nhà ở xã hội khiến người dân tranh 150 suất mua ở Hà Nội- Ảnh 4.

The project has a selling price of 19.5 million VND/m2, including VAT. According to the assessment, this is the highest approved social housing price ever in Hanoi.

Hiện trạng dự án nhà ở xã hội khiến người dân tranh 150 suất mua ở Hà Nội- Ảnh 5.

Posing as a person who is in need of buying social housing at the Trung Van social housing project, the broker advised the selling price ranging from 35-39 million VND/m2, depending on the unit and location of each unit. This price is twice as high as the starting price of 19.5 million VND/m2.

Hiện trạng dự án nhà ở xã hội khiến người dân tranh 150 suất mua ở Hà Nội- Ảnh 6.
Hiện trạng dự án nhà ở xã hội khiến người dân tranh 150 suất mua ở Hà Nội- Ảnh 7.

The construction unit is actively completing the exterior painting of the building.

Hiện trạng dự án nhà ở xã hội khiến người dân tranh 150 suất mua ở Hà Nội- Ảnh 8.

The project is expected to hand over houses in the first quarter of 2025.

Hiện trạng dự án nhà ở xã hội khiến người dân tranh 150 suất mua ở Hà Nội- Ảnh 9.

The social housing building has 3 elevators with 11 apartments/floor, a total of 275 apartments, with an area of ​​over 69 m2 - over 88 m2. Each apartment will have an open space with a balcony and loggia, designed with 2 - 3 bedrooms, depending on the area.

Hiện trạng dự án nhà ở xã hội khiến người dân tranh 150 suất mua ở Hà Nội- Ảnh 10.

Trung Van social housing project is located in the city center, convenient traffic connection, surrounded by large urban areas and available utilities such as Cat Linh - Ha Dong elevated train, Hospital 103, Ring Road 3.



Source: https://www.nguoiduatin.vn/hien-trang-du-an-nha-o-xa-hoi-khien-nguoi-dan-tranh-150-suat-mua-o-ha-noi-204240814144451567.htm

Comment (0)

No data
No data

Same tag

Same category

Same author

Figure

Foreign newspapers praise Vietnam's 'Ha Long Bay on land'
Fishermen from Quang Nam province caught dozens of tons of anchovies by casting their nets all night long in Cu Lao Cham.
World's top DJ explores Son Doong, shows off million-view video
Phuong "Singapore": Vietnamese girl causes a stir when she cooks nearly 30 dishes per meal

No videos available