The Chairman of the Provincial People's Committee has just decided to approve the adjustment of the project to renovate and upgrade DT910B in Binh Minh Town and Binh Tan District with a total investment from 206 billion VND to over 235 billion VND.
The project has a total length of 8,700m, the starting point connects with the frontage road leading to My Thuan - Can Tho expressway in Thuan An commune (Binh Minh town) and the end point intersects with DT908 in Nguyen Van Thanh commune (Binh Tan district).
The road section is designed according to the standards of a level IV plain road, with a 9m wide roadbed, 7m wide hot asphalt concrete surface, and a load capacity of 10 tons.
The bridge section on the road has 8 bridges repaired with a design load of 0.5 HL93, Rach Muc bridge alone will utilize and add new girders. In addition, the project also invests in expanding 16 cross-road culverts and longitudinal culvert systems (in sections passing through densely populated areas, administrative areas of communes), lighting, residential roads and traffic safety systems.
Thereby, it aims to facilitate travel, meet the demand for goods transportation; synchronously combine with regional traffic infrastructure, create momentum to promote the development of local industries and sectors and increase people's income. The project is invested by the Vinh Long Provincial Project Management Board and implemented from 2023-2025.
TRUST
Source: https://baovinhlong.vn/tin-moi/202504/tren-235-ty-dong-dau-tucai-tao-nang-cap-dt910b-e5b6248/
Comment (0)