Performing the inauguration ceremony of Huynh Thi Huong Street
Huynh Thi Huong Street is constructed with concrete from the starting point adjacent to National Highway 91 to the internal road in Vinh Loc hamlet, with a length of 1.5km, width of 3m, concrete thickness of 20cm. The total cost is about 949 million VND from socialized sources and labor contributions of people inside and outside the area.
Rewarding groups and individuals with positive contributions
On this occasion, Chau Phu District People's Committee and Cai Dau Town People's Committee commended collectives and individuals who actively contributed to the construction of the road.
MY NGAN - QUANG HUY
Source: https://baoangiang.com.vn/khanh-thanh-duong-huynh-thi-huong-thi-tran-cai-dau-a417880.html
Comment (0)