During the renovation process, the construction unit will replace the sunken embankment area, combined with the installation of a solar lighting system along the lake. In addition, the central area of the lake will have a pedestrian bridge connecting the two banks in the shape of a guitar, promising to bring an attractive entertainment space for local people.
![]() |
The construction unit proceeded to drain the water in the regulating lake in the park. |
![]() |
The construction unit is driving concrete piles to build a pedestrian bridge in the park. |
![]() |
Panoramic view of the construction site of the pedestrian bridge. |
![]() |
Many other items in Nghia Do Park are being upgraded and renovated. |
![]() |
Reinforce concrete foundation, pave fake stone bricks along lakeside road in park. |
![]() |
The embankment area in Nghia Do park is under construction. |
![]() |
Workers are rushing to renovate the embankment. |
![]() |
Although Nghia Do Park is closed for renovation, many people still go inside to walk, play, and exercise. |
![]() |
People still play sports right next to areas under renovation. |
![]() |
It is expected that by November 2025, Nghia Do Park will have a new, more modern look. |
Comment (0)