Units have restored operation of 40/42 power lines and 16/17 110kV transformer stations. Regarding medium voltage lines, 134 lines have been restored, while 13 medium voltage lines are still without power, of which 3 lines are customer assets.
At the time of reporting, more than 480,000 household electricity customers had their power restored, reaching about 75%. The whole province still has 805 distribution transformer stations without power, of which Kinh Mon has the most with 192 stations, Tu Ky has 150 stations, Gia Loc has 115 stations, Chi Linh has 91 stations and Ninh Giang has 71 stations;
For large customers, there are still 23 customers using electricity for production and business that are still without power. In industrial zones and clusters, there are still 8 small industrial clusters that have not been supplied with electricity, mainly in Kinh Mon including Long Xuyen, Duy Tan, Phu Thu, Minh Tan, An Luu, Pham Menh, That Hung and the small industrial cluster in Co Dung commune (Kim Thanh).
Up to now, Hai Duong Power Company Limited has continued to mobilize 100% of its personnel to fix power grid problems, prioritizing the repair of power lines and transformer stations supplying power to the drainage pumping station. The Power Company has directed its affiliated units and construction units to focus on human resources and means to carry out the task of planting power poles to replace those broken by the storm; carefully checking low-voltage lines to ensure safe conditions for energizing...
Due to power outage, on the morning of September 10, some gas stations in Kinh Mon and Kim Thanh stopped selling.
However, some stores have used generators to maintain operations and provide timely gasoline to serve people.
Source: https://baohaiduong.vn/88-5-so-tram-bom-tieu-ung-duoc-cap-dien-tro-lai-392680.html
Comment (0)