At 3:30 p.m. this afternoon, November 11, the lake water level was 252.12m, the water flow into the lake was 67.29m3 /s, the water flow through the hydroelectric generator was 109.16m3 /s; the overflow water flow was 10.58m3 /s.
Implementing current regulations on inter-reservoir operation in the Vu Gia - Thu Bon river basin and Dak Mi 4 hydropower reservoir operation, Dak Mi Hydropower Joint Stock Company will gradually lower the reservoir water level to the flood level of +251.5m before 7:00 p.m. on November 12.
Accordingly, the start of operation is from 7:00 p.m. tonight, November 11. Expected increase in regulated flow through the spillway: 50-700m3 /s. Switch to operating mode according to regulations in point b, point c, clause 1, article 8, Procedure 1865.
Dak Mi Hydropower Joint Stock Company requests authorities at all levels to deploy response work according to regulations.
Source: https://baoquangnam.vn/thuy-dien-dak-mi-4-van-hanh-ha-muc-nuoc-ho-tu-19-gio-toi-nay-11-11-3144080.html
Comment (0)