Proposal to the Prime Minister to build a highway overpass after successful testing in Xuan Cau duty-free zone

Báo Tuổi TrẻBáo Tuổi Trẻ18/12/2024

Hoa Binh Company Limited has just proposed to the Prime Minister to build a highway overpass in the Mekong Delta with an investment rate of about 12 million VND/m2 of highway.


Đề xuất Thủ tướng cho làm cầu cạn cao tốc sau thử nghiệm thành công ở khu phi thuế quan Xuân Cầu - Ảnh 1.

The expressway viaduct built by Hoa Binh Group in the Xuan Cau - Lach Huyen duty-free zone was successfully tested recently - Photo: TIEN DU

Overcoming the shortage of sand for highway embankment

Before proposing to the Prime Minister a solution to build a highway viaduct (building an elevated highway using a bridge on PRC high-strength concrete piles), in September 2023, Hoa Binh Company Limited (Hoa Binh Group) surveyed the technology and experience of building highway viaducts in the following countries: Germany, China, and Indonesia.

Next, from February to June 2024, Hoa Binh Group invited design consulting companies to examine and design, and signed a contract to test the construction of a 2-storey overpass using PRC high-strength concrete pile bridge technology in the Xuan Cau - Lach Huyen duty-free zone, Hai Phong City.

This experimental viaduct highway section was built on weak soil in Lach Huyen port area, with the first floor length of about 550m, the second floor of about 100m, the viaduct width of 10.5m (Van bridge road).

The construction time of the pilot project was only 2 months. After completion, the pilot project was tested and inspected with results meeting the current bridge design requirements of TCVN 11823-1:2017; prestressed centrifugal concrete piles according to TCVN 7888:2014; prestressed plate girders DIN QAA 4.0.

According to Dr. Tran Ba ​​Viet - Vice President of the Vietnam Association of Building Materials and Vice President of the Vietnam Concrete Association, the technology of constructing elevated highways using bridge decks on high-strength PRC concrete piles is being widely applied in many countries such as Germany, China, and Indonesia.

In the context of the current nationwide shortage of sand and soil for highway embankment, Mr. Viet believes that building elevated highways using the slab-on-pile bridge method, combined with the solution of high-strength concrete U-beam HPC, ultra-high-strength concrete UHPC for locations requiring large spans, will be more effective than the traditional solution of using soil and sand for embankment construction when building highways, especially in areas with weak ground such as the Mekong Delta.

Đề xuất Thủ tướng cho làm cầu cạn cao tốc sau thử nghiệm thành công ở khu phi thuế quan Xuân Cầu - Ảnh 2.

The expressway section was built on a trial basis using PRC high-strength concrete pile bridge technology - Photo: TIEN DU

Investment rate 12 million VND/ m2 of expressway viaduct

In addition to the trial construction of a two-story overpass expressway in the Xuan Cau duty-free zone, Hoa Binh Group has recently spent its own money to hire consultants to survey the depth of pile driving when building expressways in regions across the country.

Survey results show that the pile driving depth when implementing the expressway viaduct solution in some areas is as follows: Lach Huyen, Hai Phong City 35m, Hai Duong, Hung Yen, Bac Ninh, Hanoi areas from 20-22m, Ninh Binh from 10-12m, in the Mekong Delta from 25-50m.

Mr. Nguyen Huu Duong, Chairman of Hoa Binh Group, shared that with the technology of building elevated highways using bridge slabs on high-strength concrete piles PRC, depending on each geological area the highway runs through, the load-bearing capacity and pile depth will be calculated and designed in accordance with Vietnamese standards.

Mr. Duong also said that with the solution of building the expressway viaduct, there will be no time wasted waiting for subsidence when filling the expressway foundation, taking full advantage of precast PRC piles, hollow panels with precast ribs to shorten construction time. This is a fast construction solution, environmentally friendly and the estimated investment cost is about 12 million VND/ m2 of expressway.

Previously, in a document sent to Hoa Binh Group in July 2024, the Ministry of Transport also highly appreciated the enterprise's proactive research and proposal to use overpass solutions for traffic construction projects.

Hoa Binh Group's proposal is a technical solution that has been piloted and tested on a small scale. Preliminary assessments show that it has many advantages such as fast construction and is environmentally friendly, according to the Ministry of Transport.

The Ministry has also assigned the Institute of Transport Science and Technology to preside over and coordinate with Hoa Binh Group to clarify the contents related to the group's proposed solutions.

Đề xuất Thủ tướng cho làm cầu cạn cao tốc sau thử nghiệm thành công ở khu phi thuế quan Xuân Cầu - Ảnh 3. Lack of sand, should we build a highway viaduct?

Building viaducts combined with above-ground sections is considered a feasible solution to overcome the shortage of river sand and highway embankment soil in the Mekong Delta.



Source: https://tuoitre.vn/de-xuat-thu-tuong-cho-lam-cau-can-cao-toc-sau-thu-nghiem-thanh-cong-o-khu-phi-thue-quan-xuan-cau-20241218131226679.htm

Comment (0)

No data
No data
Spring comes to Sa Dec flower village

Spring comes to Sa Dec flower village

Cùng chủ đề

About the West

About the West

Báo Đại Đoàn Kết
Báo Đại Đoàn Kết
28/01/2025
The dream of a generation

The dream of a generation

Người Lao Động
Người Lao Động
27/01/2025
Early completion of North Expressway operation

Early completion of North Expressway operation

Báo Giao thông
Báo Giao thông
25/01/2025
Investing nearly 9,300 billion VND to upgrade 3 national highways in the Mekong Delta

Investing nearly 9,300 billion VND to upgrade 3 national highways in the Mekong Delta

Báo Giao thông
Báo Giao thông
25/01/2025
Rest stops on the Northern Expressway

Rest stops on the Northern Expressway

Việt Nam
Việt Nam
23/01/2025
The rumbling sound of machines at the Quang Ngai highway construction site

The rumbling sound of machines at the Quang Ngai highway construction site

Báo Giao thông
Báo Giao thông
20/01/2025

Cùng chuyên mục

'Ample' bank salary: Average place is 49 million/month, revealing a place with unexpected increase

'Ample' bank salary: Average place is 49 million/month, revealing a place with unexpected increase

Báo Tuổi Trẻ
Báo Tuổi Trẻ
12 giờ trước
Vietnamese 'dinosaur' goods to the world

Vietnamese 'dinosaur' goods to the world

Báo Tuổi Trẻ
Báo Tuổi Trẻ
10 giờ trước
Quoc Cuong Gia Lai's cash is increasing, increasing 'hotly' at the end of the year

Quoc Cuong Gia Lai's cash is increasing, increasing 'hotly' at the end of the year

Báo Tuổi Trẻ
Báo Tuổi Trẻ
4 giờ trước
Many families go on spring outings, shops and supermarkets open during Tet to welcome customers

Many families go on spring outings, shops and supermarkets open during Tet to welcome customers

Báo Tuổi Trẻ
Báo Tuổi Trẻ
5 giờ trước
First day of Tet: Vietnamese tourists eagerly depart for spring travel, international tourists eagerly celebrate Vietnamese Tet

First day of Tet: Vietnamese tourists eagerly depart for spring travel, international tourists eagerly celebrate Vietnamese Tet

Báo Tuổi Trẻ
Báo Tuổi Trẻ
9 giờ trước
Market on the first day of Tet: Convenience stores open throughout Tet, fresh fruit for temple visits increases slightly in price

Market on the first day of Tet: Convenience stores open throughout Tet, fresh fruit for temple visits increases slightly in price

Báo Tuổi Trẻ
Báo Tuổi Trẻ
11 giờ trước

Cùng tác giả

Quoc Cuong Gia Lai's cash is increasing, increasing 'hotly' at the end of the year

Quoc Cuong Gia Lai's cash is increasing, increasing 'hotly' at the end of the year

Báo Tuổi Trẻ
Báo Tuổi Trẻ
4 giờ trước
Many families go on spring outings, shops and supermarkets open during Tet to welcome customers

Many families go on spring outings, shops and supermarkets open during Tet to welcome customers

Báo Tuổi Trẻ
Báo Tuổi Trẻ
5 giờ trước
Soldiers away from home celebrate Tet with folk games, not forgetting their duties

Soldiers away from home celebrate Tet with folk games, not forgetting their duties

Báo Tuổi Trẻ
Báo Tuổi Trẻ
6 giờ trước
I was so happy at the beginning of the year when I read the news that the person who lost 1.5 million VND received a lucky money gift of 100 million VND.

I was so happy at the beginning of the year when I read the news that the person who lost 1.5 million VND received a lucky money gift of 100 million VND.

Báo Tuổi Trẻ
Báo Tuổi Trẻ
7 giờ trước
Hanoi streets are bustling with people on the first day of the Lunar New Year.

Hanoi streets are bustling with people on the first day of the Lunar New Year.

Báo Tuổi Trẻ
Báo Tuổi Trẻ
8 giờ trước
First day of Tet: Vietnamese tourists eagerly depart for spring travel, international tourists eagerly celebrate Vietnamese Tet

First day of Tet: Vietnamese tourists eagerly depart for spring travel, international tourists eagerly celebrate Vietnamese Tet

Báo Tuổi Trẻ
Báo Tuổi Trẻ
9 giờ trước
Happy VietNam

Tác phẩm Ngày hè

Figure

Young man donates blood 130 times to save people

Young man donates blood 130 times to save people

Báo Nhân dân
Báo Nhân dân
3 giờ trước
The female doctor has many research projects on drug delivery materials for brain cancer treatment.

The female doctor has many research projects on drug delivery materials for brain cancer treatment.

Báo Thanh niên
Báo Thanh niên
3 giờ trước
Great-grandson of architect who designed Hanoi Opera House tells story of “awakening” architectural heritage

Great-grandson of architect who designed Hanoi Opera House tells story of “awakening” architectural heritage

Báo Quân đội Nhân dân
Báo Quân đội Nhân dân
15 giờ trước
'5 Good' Male Student Has Absolute GPA, Owns Many Math Publications

'5 Good' Male Student Has Absolute GPA, Owns Many Math Publications

Báo Tiền Phong
Báo Tiền Phong
15 giờ trước
Famous Snake-year businessmen in Vietnamese business world

Famous Snake-year businessmen in Vietnamese business world

VTC News
VTC News
15 giờ trước
IJSO 2024 Bronze Medalist Nguyen Thanh Nhan: The Little Turtle Has Reached the Finish Line

IJSO 2024 Bronze Medalist Nguyen Thanh Nhan: The Little Turtle Has Reached the Finish Line

Báo Dân trí
Báo Dân trí
15 giờ trước
Tet In Dreams: Smiles in the 'scrap village'
Tet In Dreams: Smiles in the 'scrap village'
Ho Chi Minh City from above
Ho Chi Minh City from above
Beautiful image of chrysanthemum field in harvest season
Beautiful image of chrysanthemum field in harvest season
Young people lined up from 6:30 a.m. and waited 7 hours to take photos at an ancient cafe.
Young people lined up from 6:30 a.m. and waited 7 hours to take photos at an ancient cafe.

No videos available