English
Login
Home
Topic
News
Political System
Local
Event
Happy Vietnam
Business
Product
Heritage
Figure
Multimedia
Data
National Grid
The Ialy Hydropower Plant expansion unit has been connected to the national grid.
Việt Nam
26/11/2024
Who is exempt from electricity license and unlimited capacity of rooftop solar installation?
Báo Tuổi Trẻ
28/10/2024
Indonesia establishes agency to implement nuclear energy program
Báo Sài Gòn Giải phóng
13/09/2024
Important node in the national power grid
Việt Nam
28/08/2024
In the North, rooftop solar power can be sold at 20% of capacity.
Việt Nam
27/07/2024
Much remains to be done to effectively implement the direct electricity trading mechanism.
Việt Nam
09/07/2024
Rooftop solar power is bought and sold directly, not through EVN.
Việt Nam
04/07/2024
Electricity consumption exceeds 1 billion kWh for the first time, EVN recommends saving
Báo Thanh niên
30/05/2024
Prime Minister requests energizing 500kV line circuit 3 before June 30
VTC News
23/05/2024
Proposal to sell excess rooftop solar power to the national grid
VietNamNet
10/04/2024
Self-produced and self-consumed electricity connected to the grid still costs 0 VND
Báo Thanh niên
29/03/2024
Project to supply electricity from the grid to Con Dao district: Still lacking more than 2,400 billion VND
Báo Dân trí
16/01/2024
Hydropower plant capacity short of 5,000 MW, North continues to have power outages
Báo Thanh niên
12/06/2023
5 solar and wind power projects ready to generate electricity to the grid
Báo Thanh niên
26/05/2023
16 wind and solar power plants have been connected to the national grid.
Báo Thanh niên
26/05/2023
15 wind and solar power plants approved for electricity purchase price
Báo Thanh niên
20/05/2023
Power Plan 8 prioritizes renewable energy development, stops coal-fired thermal power
Báo Thanh niên
16/05/2023