The Dong Viet bridge approach road connecting National Highway 37 is 5.3 km long, passing through the wards and communes of Hung Dao, Le Loi, Cong Hoa (Chi Linh); the scale of the road is class II, the roadbed is 22.5 m wide; the design speed is 80 km/h, the total investment capital is more than 469.8 billion VND. The Dong Viet bridge approach road construction investment project is implemented by a consortium of the following joint stock companies: Con Son Construction Materials, Viet Hoa Construction and Trade, Thu Do Construction and Equipment, Vu Bach Construction and Trade Company Limited as the contractor.
Dong Viet Bridge Project invested by Bac Giang province with a length of over 730 m, a bridge deck width of 22.5 m, a bridge deck width of 22.5 m. The main bridge consists of 2 cable-stayed spans, a flat deck, and the approach bridge consists of 14 Super T spans. Dong Viet Bridge is constructed by a joint venture of Thuan An Construction and Trade Development Joint Stock Company - Trung Chinh Construction and Trade Company Limited - 168 Vietnam Construction Investment and Import-Export Joint Stock Company. This is the first and largest cable-stayed bridge in Bac Giang province, crossing the Thuong River to connect with Hai Duong province.
Source
Comment (0)