Close-up of 2 abandoned dormitories worth nearly 700 billion VND

Báo Thanh niênBáo Thanh niên08/12/2023


Two projects, including the concentrated student dormitory area in the west of Da Nang City and the concentrated dormitory area in the west of Da Nang City expansion, both located in Lien Chieu District, with a total of 7 7-storey buildings, have been abandoned for a long time.

Of which, the concentrated dormitory area in the west of Da Nang City has an area of ​​5.6 hectares, including 5 blocks of 7-storey buildings, with a scale of about 700 rooms, with an investment capital of about 397 billion VND. The concentrated dormitory area in the west of Da Nang City expansion has an area of ​​3.5 hectares, with 2 blocks of 7-storey buildings, with an investment capital of about 298 billion VND.

According to Thanh Nien reporters on December 8, many items of the concentrated dormitory area in the west of Da Nang City have degraded and are damaged, with only 2 security guards watching over them every day.

Đà Nẵng: Cận cảnh ký túc xá đầu tư 700 tỉ đồng bỏ hoang, xuống cấp - Ảnh 1.

The dormitory area is concentrated in the west of Da Nang City, including 5 7-storey buildings with about 700 rooms.

Đà Nẵng: Cận cảnh ký túc xá gần 700 tỉ đồng bỏ hoang, xuống cấp - Ảnh 2.

The concentrated dormitory area in the west of Da Nang City expansion has an area of ​​3.5 hectares, with 2 7-storey buildings.

Đà Nẵng: Cận cảnh ký túc xá đầu tư 700 tỉ đồng bỏ hoang, xuống cấp - Ảnh 2.

Despite hundreds of billions of dong invested and spacious construction, the project is abandoned.

Đà Nẵng: Cận cảnh ký túc xá đầu tư 700 tỉ đồng bỏ hoang, xuống cấp - Ảnh 3.

Many items of the building are degraded and damaged. On the first floor of the building, weeds and vines cover

Đà Nẵng: Cận cảnh ký túc xá đầu tư 700 tỉ đồng bỏ hoang, xuống cấp - Ảnh 4.

Fire protection systems in buildings are seriously degraded.

Some items such as glass doors were broken by the wind, plaster ceilings were damaged...

Many lighting equipment, electrical wires are damaged...

Đà Nẵng: Cận cảnh ký túc xá đầu tư 700 tỉ đồng bỏ hoang, xuống cấp - Ảnh 7.

When the Covid-19 epidemic broke out, the Da Nang City government requisitioned these two dormitories as field hospitals to quarantine and treat 3,900 patients. By October 2021, Da Nang City stopped operating the field hospital, related units sprayed disinfectants, cleaned the environment, but since then the concentrated student dormitory has been abandoned.

"Since it was no longer used as a Covid-19 field hospital, many parts of the building have been damaged and degraded. The dormitory was built for students from schools in the west, but due to its location far from universities and colleges, no students have registered to stay..."

Mr. H., security guard of the student dormitory area in the west of the city

Đà Nẵng: Cận cảnh ký túc xá đầu tư 700 tỉ đồng bỏ hoang, xuống cấp - Ảnh 9.

In May 2020, the Ministry of Construction established a working group to "Inspecte student housing projects invested in and built with government bond capital in the period 2009 - 2015", including these two projects. By September 2021, the Ministry of Construction sent an official dispatch to the Prime Minister requesting the recovery of government bond capital invested in these two dormitories.

Đà Nẵng: Cận cảnh ký túc xá đầu tư 700 tỉ đồng bỏ hoang, xuống cấp - Ảnh 10.

In November 2021, the People's Committee of Da Nang City issued a document proposing to convert the function of the concentrated dormitory area in the west of the city and the expanded concentrated dormitory area in the west of the city into housing for workers, and was approved by the Prime Minister.

Đà Nẵng: Cận cảnh ký túc xá đầu tư 700 tỉ đồng bỏ hoang, xuống cấp - Ảnh 11.

The Management Board of Investment Projects for Construction of Civil and Industrial Works of Da Nang City (the unit managing the two dormitories) said that it is developing a project to convert the dormitory area into workers' housing. "When completed, the Management Board of Investment Projects for Construction of Civil and Industrial Works of Da Nang City will assign the Da Nang Housing Management and Exploitation Center to carry out the next steps," the Management Board representative added.



Source link

Comment (0)

No data
No data

Same tag

Same category

Spreading national cultural values ​​through musical works
Lotus color of Hue
Hoa Minzy reveals messages with Xuan Hinh, tells behind-the-scenes story of 'Bac Bling' causing global fever
Phu Quoc - tropical paradise

Same author

Heritage

Figure

Business

No videos available

News

Ministry - Branch

Local

Product