Panoramic view of the nearly 800 billion VND Children's Hospital with eye-catching colors about to be inaugurated on the occasion of the Liberation of the Capital

Báo Dân ViệtBáo Dân Việt30/09/2024


Panoramic view of the nearly 800 billion VND Children's Hospital with eye-catching colors about to be inaugurated on the occasion of the Liberation of the Capital

Monday, September 30, 2024 08:08 AM (GMT+7)

After nearly 2 years of construction, Hanoi Children's Hospital (phase 1, in Yen Nghia ward, Ha Dong district) will be officially inaugurated on the occasion of the 70th anniversary of the Liberation of the Capital (October 10, 1954 - October 10, 2024).

img

The Hanoi Children's Hospital construction project (phase 1, in Yen Nghia ward, Ha Dong district) is a key project in the 2020 - 2025 period. The project was officially inaugurated in February 2022 and is expected to be inaugurated on October 8, celebrating the 70th anniversary of the Liberation of the Capital (October 10, 1954 - October 10, 2024).

img

According to the design, Hanoi Children's Hospital consists of a 6-storey building with 2 units (1A and 1B). Of which, unit 1A has an area of ​​17,316 m2 including the examination department (with a capacity of more than 500 examinations/day); emergency areas, technical and paraclinical services; administration. Unit 1B has an area of ​​11,797 m2 with the function of inpatient treatment and integrated services.

img

The blocks located on the basement have an area of ​​5,540 m2; including an infection control area, parking, warehouses, garbage tanks and other supporting technical systems; the northeast of the land is arranged with a technical area including an oxygen station, wastewater treatment station, water tank, transformer station, etc.

img

As of September 29, the project has basically completed all items.

img

Modern security camera surveillance system, installed in many locations.

img

Flowers are planted around the hospital to create scenery.

img

Currently, Hanoi Children's Hospital is running a trial operation before officially opening and welcoming patients.

img

The contractor is actively completing the painting items outside the gate.

img

The landscape behind the hospital is newly planted with many trees with a design close to nature.

img

Part of the hospital's rooftop area is designed as an open space, with light coming from the skylights.

img

Once completed and put into operation, the hospital is expected to help reduce the load on the National Children's Hospital and neighboring provinces, meeting the medical examination and treatment needs of the people of the capital and the northern region.

Pham Hung



Source: https://danviet.vn/toan-canh-benh-vien-nhi-gan-800-ty-dong-voi-gam-mau-bat-mat-sap-khanh-thanh-dip-giai-phong-thu-do-202409291556131.htm

Comment (0)

No data
No data

Same tag

Same category

Explore Lo Go - Xa Mat National Park
Quang Nam - Tam Tien fish market in the South
Indonesia fired 7 cannon shots to welcome General Secretary To Lam and his wife.
Admire the state-of-the-art equipment and armored vehicles displayed by the Ministry of Public Security on the streets of Hanoi

Same author

Heritage

Figure

Business

No videos available

News

Ministry - Branch

Local

Product