Many horizontal axes are gradually being formed to connect with vertical axes, creating a synchronous traffic infrastructure for the coastal city of Vung Tau, gradually affirming the modern tourism class with a superior road system.
At the projects, motorbikes, equipment, and personnel are rushing to speed up the progress, working from morning to night. The sounds of rollers, excavators, and excavators resound throughout the area, creating a vivid picture, reflecting the strong change in local traffic. On Cau Chay Street, Mai Van Xuan workers are fixing the iron frame right at the border with Do Luong Street. On Hang Dieu Street (left), workers are also focusing on rolling the ground.
Source: https://www.baogiaothong.vn/pho-bien-hoi-ha-chuyen-minh-voi-8-duong-giao-thong-truc-ngang-hien-dai-192241125172238794.htm
Comment (0)