On September 11, Hai Duong Hydrometeorological Station said that the water level of some rivers in the province has reached alert level 3.
Specifically, the water level of Thai Binh River at Cat Khe Hydrological Station (Nam Sach) reached alarm level 3 (5.00m) at 10:00 p.m. on September 10, at Phu Luong Hydrological Station (Hai Duong City) reached alarm level 3 at 5:00 a.m. on September 11; The water level of Kinh Mon River at An Phu Hydrological Station (Kinh Mon) reached alarm level 3 at 4:00 a.m. on September 11. Other rivers are also likely to reach alarm level 3 this morning.
Authorities assist people in evacuating.
Recorded in Hai Duong city on the morning of September 11, the water level in the riverbanks on the left and right sides of Thai Binh river (in the wards and communes of Viet Hoa, Cam Thuong, Binh Han, Nhi Chau, Ngoc Chau, Hai Tan, Ngoc Son, An Thuong, Nam Dong, Tien Tien) was flooded and rising.
The water level of Thai Binh River is 2-2.5m above the average; about 1.3-1.5m from the dike surface. The flood level in the riverbank area of Huu Lai Vu (Ai Quoc ward) has been flooded and is rising. The water level at Au Thuyen sluice is 3.8m, about 1m different from Sat River.
Hai Duong requests to postpone unnecessary meetings. The Chairman of the District People's Committee, heads of relevant departments, agencies, and units are responsible to the Chairman of the Provincial People's Committee if they are subjective, negligent in leadership, direction, and slow in responding to floods and storms, leading to untimely detection of construction incidents, causing serious incidents, causing great loss of life and property.
Hai Duong has deployed forces, strictly patrolled and guarded the dykes and is on duty to prevent floods according to the warning level. Identify specific areas where households living outside the riverbank are unsafe (including inside the dykes) to immediately implement plans to evacuate people and property.
All vehicles are prohibited from traveling on the dike during flood warnings, except for vehicles permitted to travel on the dike. Ferry operations are prohibited.
At present, the dike system of Hai Duong city is safe and there are no incidents. Hai Duong city currently manages 3 dike routes with a total length of 31.786 km. Of which, the right dike route of Thai Binh is 15.234 km long, the left dike route of Thai Binh is 15.215 km long and the right dike route of Lai Vu is 1.337 km long.
Comment (0)