The Hanoi Department of Construction has just requested the Hanoi City Technical Infrastructure Management Center to coordinate with the Traffic Infrastructure Maintenance Board to study plans and solutions to overcome flooding and waterlogging spots as well as have traffic organization plans for these black spots. This unit also needs to study and coordinate with consulting units to immediately deploy solutions applying science and technology to effectively handle flooding spots right in the rainy season of 2025.
Notably, the Department of Construction requested to speed up the implementation of the Flood Control Construction Investment Project for some locations in inner-city districts and the drainage system repair projects in the city managed by the Department of Construction approved by the City People's Committee.

The Traffic Infrastructure Maintenance Board was assigned to coordinate with the Hanoi City Technical Infrastructure Management Center to review and unify solutions and plans for organizing traffic safety at flooded areas in the city.
It is known that Hanoi currently has 11 flooded areas with rainfall from 50mm/h to 70mm/h; 19 flooded areas with rainfall over 100mm/h). Currently, the city is implementing a number of projects such as: Drainage system, regulating lake, Vinh Thanh pumping station (Dong Anh district); upgrading and constructing Phuong Trach pumping station (Dong Anh district); improving the drainage system in the western area at Yen Nghia pumping station (Ha Dong district). Along with that, a series of projects are being prepared for investment such as the rainwater drainage system of the left basin of Nhue river, the drainage system of Ha Dong district in the right basin of Nhue river, Gia Thuong pumping station, regulating lake and Thuong Thanh canal (Long Bien district); localized flood prevention project for inner-city districts and some suburban districts.
Source: https://cand.com.vn/Xa-hoi/ra-soat-cac-diem-ngap-lut-truoc-mua-mua-bao-i762234/
Comment (0)