Vietnam.vn - Nền tảng quảng bá Việt Nam

Efforts to overcome incidents caused by storm No. 3, ensuring smooth traffic

Việt NamViệt Nam09/09/2024


Due to the impact of storm No. 3, many roads in the province have landslides, road surface silting, road flooding... causing traffic obstruction. Immediately after discovery, the Department of Transport urged management units to coordinate with local authorities to mobilize human resources and vehicles to focus on overcoming the incident to ensure smooth traffic. At the same time, propaganda was issued to warn people and vehicles to be careful when passing through sections of roads with landslides, road surface silting, and rocks rolling onto the road.

Efforts to overcome incidents caused by storm No. 3, ensuring smooth traffic

Thanh Hoa Road Management Joint Stock Company II mobilized human resources and equipment to overcome landslides on National Highway 15.

Efforts to overcome incidents caused by storm No. 3, ensuring smooth traffic

Traffic management unit mobilized human resources and machinery to fix landslide in Quan Hoa district.

Efforts to overcome incidents caused by storm No. 3, ensuring smooth traffic

Forces mobilized machinery to clear flooded roads in Quang Chieu commune (Muong Lat).

Efforts to overcome incidents caused by storm No. 3, ensuring smooth traffic

Road management units are on duty at landslide sites to ensure smooth traffic.

Efforts to overcome incidents caused by storm No. 3, ensuring smooth traffic

The road management unit mobilized workers to clear the road surface.

Efforts to overcome incidents caused by storm No. 3, ensuring smooth traffic

By the morning of September 9, landslides and damage on national highways and provincial roads had been handled to ensure smooth and safe traffic.

Efforts to overcome incidents caused by storm No. 3, ensuring smooth traffic

Currently, the section from Km88+750-Km88+810/QL.15C, in Pu Nhi commune (Muong Lat), has sunk 2/3 of the road surface, temporarily making traffic difficult. The authorities have diverted traffic and guided vehicles.

According to the Department of Transport, as of the morning of September 9, on the National Highways (QL) entrusted with positive slope landslides, rolling rockslides, road surface sedimentation, longitudinal ditch sedimentation, and culvert sedimentation occurred at 92 locations (QL15/16 locations, QL16/30 locations, QL15C/46 locations), with a total volume of about 9,146 m3 . Negative slope landslides occurred at 4 locations (QL15/1 location, QL16/2 locations, QL15C/1 location) with a total length of 100m. On the provincial road (DT), positive slope landslides, rolling rocks deposited along the ditch, and culverts were recorded at more than 58 locations, with a volume of about 2,895 m3 (DT.519B/1 location, DT.521/34 locations, DT.521D/13 locations, DT.530C/6 locations, Pu Nhi - Muong Chanh road/4 locations). Negative slope landslides occurred at 4 locations with a length of about 82 m (DT.521 has 2 locations, DT.521C has 2 locations). Landslides and damage to the downstream yard and culvert slope at Km10+170 of Pu Nhi - Muong Chanh road with a volume of about 8 m3 .

Le Hoi



Source: https://baothanhhoa.vn/no-luc-khac-phuc-su-co-do-bao-so-3-bao-dam-giao-thong-thong-suot-224295.htm

Comment (0)

No data
No data

Same tag

Same category

Ninh Binh tourist attractions not to be missed
Wandering in the clouds of Dalat
Villages on the Truong Son mountain range
Fall in love with the green color of young rice season in Pu Luong

Same author

Heritage

Figure

Business

No videos available

News

Political System

Local

Product