Vietnam.vn - Nền tảng quảng bá Việt Nam

Hanoi invests more than 2,300 billion VND to build the intersection between Ring Road 3.5 and Thang Long Avenue.

On April 19, the Hanoi People's Committee held a ceremony to open traffic on Le Quang Dao Street (from Thang Long Avenue, Nam Tu Liem District to the boundary of Duong Noi Urban Area (Ha Dong District).

Thời báo Ngân hàngThời báo Ngân hàng19/04/2025

Các đồng chí lãnh đạo T.Ư, TP Hà Nội bấm nút khởi công Dự án đầu tư xây dựng nút giao khác mức giữa đường Vành đai 3,5 với Đại lộ Thăng Long
Leaders of the Central and Hanoi City pressed the button to start the project to invest in building a different level intersection between Ring Road 3.5 and Thang Long Avenue.

This is an activity to celebrate the 50th anniversary of the Liberation of the South and National Reunification Day (April 30, 1975 - April 30, 2025).

The investment project to build a different level intersection between Ring Road 3.5 and Thang Long Avenue, Hoai Duc District, is invested by Hanoi City's budget, with the Hanoi City Civil Works Construction Investment Project Management Board as the investor. The goal is to complete the traffic infrastructure system according to the plan; connect and exploit reasonably with the traffic infrastructure that has been invested and built; serve the needs of goods circulation, production and people's travel needs, reduce traffic congestion, contribute to accelerating the formation of urban areas in the region, promote the socio-economic development of the capital.

The project has a total investment of over 2,384 billion VND, invested by the Hanoi Civil Construction Investment Project Management Board. The construction scale of the intersection includes turbine branches combined with direct tunnels including: Construction of a direct tunnel from Le Trong Tan to National Highway 32, the centerline coincides with Le Trong Tan Street, arranging 4 lanes with a total length of 975m. The section under Thang Long Avenue is designed with a closed tunnel 150m long; on Le Trong Tan Street, an open tunnel 157.5m long, with a retaining wall 220m long; on National Highway 32, an open tunnel 157.5m long, with a retaining wall 200m long. The remaining part is a wheel guard.

The prestressed reinforced concrete slab girder turbine branch bridge has a length of 2,357m/4 branches, a bridge width of 8.8m, 2 lanes, and a reinforced concrete retaining wall with a total length of 619m.

Source: https://thoibaonganhang.vn/ha-noi-dau-tu-hon-2300-ty-dong-xay-dung-nut-giao-giua-duong-vanh-dai-35-voi-dai-lo-thang-long-163063.html


Comment (0)

No data
No data

Heritage

Figure

Business

No videos available

News

Political System

Local

Product