Vietnam.vn - Nền tảng quảng bá Việt Nam

Quang Nam Electricity proactively plans to ensure power supply on the occasion of National Day September 2

Việt NamViệt Nam30/08/2024


1. Maintenance - repair of the machine
PC Quang Nam proactively maintains and promptly handles defects on the power grid. Photo: NUI THANH ELECTRICITY, HIGH VOLTAGE POWER GRID MANAGEMENT TEAM

Quang Nam PC expects the maximum load capacity during the holiday to be 347.72MW (September 2, 2024), an increase of 9.0% over the same period in 2023 (319.01MW).

Accordingly, the company will deploy a method of operating power sources and grids to ensure safety and reliability; prioritize locations for festivals, political and cultural activities and people's needs during the holidays; and consider arranging backup generators.

The company organizes to strengthen leadership, mobile operations, and incident handling (24/7) during holidays; proactively prepares spare materials and equipment to promptly handle incidents; coordinates with localities at all levels to deploy plans to protect security, safety, and prevent fire and explosion for electrical works and grid operation locations.

In recent years, during the National Day and Mid-Autumn Festival in Quang Nam province, many incidents have occurred due to the glitter fireworks teams flying onto power lines, affecting the power supply to customers.

To ensure safe operation of the power grid and prevent incidents during the National Day holiday on September 2 and the Mid-Autumn Festival in 2024, the Power Companies under PC Quang Nam have focused on implementing many solutions. In particular, advising on documents reporting to the People's Committees of districts/towns/cities in the management area to direct relevant sectors to take measures to prevent the firing of glitter fireworks near the power grid during lion dance performances; organizing propaganda for people in many forms about the dangers that occur when using glitter fireworks near the power grid. Each unit strengthens the inspection and management of the operation of power lines and transformer stations; implements solutions to prevent power grid incidents, uses thermal cameras to inspect the joints of large load lines to promptly detect and handle defects that may cause power grid incidents, ensuring reliable and stable power grid operation.

2.athlt.jpg
Quang Nam PC requests people to cooperate and support in protecting the safety of power grid corridors.

In the past time, despite difficulties, especially hot weather, tornadoes, lightning..., PC Quang Nam has provided stable electricity for the socio-economic development needs of the locality. Especially providing safe electricity to serve important events in the province such as: Quang Nam Creative Startup Week, National Phu Dong Sports Festival, Ngoc Linh Ginseng Festival, 120th Anniversary of the Birth of Heroic Vietnamese Mother Nguyen Thi Thu, 50th Anniversary of Nong Son - Trung Phuoc Victory, 50th Anniversary of Thuong Duc Victory, 420th Anniversary of Duy Xuyen title, International Kite Festival, 11th Congress of Vietnam Fatherland Front of Quang Nam Province...



Source: https://baoquangnam.vn/dien-luc-quang-nam-chu-dong-phuong-an-dam-bao-cung-cap-dien-dip-le-quoc-khanh-2-9-3140358.html

Comment (0)

No data
No data

Same tag

Same category

Helicopter squadron carrying the national flag flies over the Independence Palace
Concert Brother Overcomes a Thousand Difficulties: 'Breaking Through the Roof, Flying to the Ceiling, and Breaking Through the Heavens and Earth'
Artists are busy practicing for the concert "The Brother Overcame a Thousand Thorns"
Ha Giang Community Tourism: When endogenous culture acts as an economic "lever"

Same author

Heritage

Figure

Business

No videos available

News

Political System

Local

Product