The medium voltage grid incident response team was deployed in Nam Tien commune, Tien Hai district.
At the launching ceremony, nearly 80 members were mobilized to join the shock team. In 2 days (April 15-16), 5 working units will carry out many construction items including: replacing and twisting the insulator; tying the insulator neck wire; strengthening the auxiliary steering contact; reinforcing the SI upper lug terminals; handling poor contact grounding points; aligning the lightning discharger and the anchor locks on the 22kV medium voltage line of Route 471, Nam Thanh Intermediate Route and Route 476 E11.9.
The shock team deployed plans to reduce medium voltage grid incidents.
Through this activity, it contributes to reducing medium-voltage grid incidents, improving transmission capacity, ensuring grid safety and providing stable electricity for the daily life and production of people and businesses.
Nguyen Trieu
Source: https://baothaibinh.com.vn/tin-tuc/9/221974/cong-ty-dien-luc-thai-binh-ra-quan-doi-xung-kich-giam-su-co-luoi-dien-trung-the
Comment (0)