The drill includes a mechanism and a practical drill. The practical drill content includes 10 hypothetical situations on the power grid system including a 110kV transformer station, medium and low voltage lines closely following reality, such as: landslides, fallen poles, twisted beams, broken porcelain, broken wires, flooded cable tunnels at a 110kV transformer station, broken optical cables, cleaning insulators with high pressure water (hotline), rescue...
With careful preparation of human resources, materials and equipment, the drill was carried out as planned, ensuring absolute safety for people and equipment. At the same time, improving the organization and command of PCTT&TKCN of the Company's leaders and the close and synchronous coordination and cooperation according to the "4 on-site" motto between affiliated units in handling situations flexibly, quickly and in accordance with technical procedures; ready to ensure safety for the power system, minimizing damage caused by natural disasters. Especially improving the effectiveness of applying technology to command, response and prevention of natural disasters, meeting the requirements of digital transformation in the National Electricity Group.
Source: https://baosonla.vn/xa-hoi/cong-ty-dien-luc-son-la-dien-tap-phong-chong-thien-tai-ung-cuu-khan-cap-va-xu-ly-su-co-Uf1KsD1HR.html
Comment (0)