188 trees cut down to expand motorbike lanes on Ho Chi Minh City's East-West Avenue

Báo Tiền PhongBáo Tiền Phong20/06/2024


To repair and renovate the median strip and expand the motorbike lane on Vo Van Kiet Avenue, 188 old, poorly growing trees will be cut down and 48 trees will be uprooted.

Recently, the Urban Traffic Management and Operation Center said that it is carrying out construction, repair and renovation of the median strip on Vo Van Kiet Street (East-West Avenue).

Accordingly, currently the motorbike lane on Vo Van Kiet Street (District 6, Ho Chi Minh City) has a narrow cross-section, and vehicles are often congested.

188 trees cut down to expand motorbike lane on East-West Avenue, Ho Chi Minh City, photo 1

48 trees were uprooted and replanted after the renovation was completed. Photo: TT

Specifically, the 2-wheel lane (from Tan Kien intersection to Saigon River tunnel) consists of 2 road sections 3m-3.5m wide and 2m-2.5m wide, separated by a hard median strip consisting of a continuous grass bed with an average width of 7m and a grass bed with trees with an average width of 2m.

However, the number of vehicles on the route is increasing, causing congestion and collisions between vehicles.

188 trees cut down to expand motorbike lane on East-West Avenue, Ho Chi Minh City, photo 2

Repairing and renovating the median strip to widen the lane for motorbikes to travel more safely. Photo: TT

Therefore, it is necessary to renovate the median strip between two lanes for two-wheeled vehicles and adjust the two-wheeled vehicle lane from two sections of road width from 3m-3.5m and 2m-2.5m to 7m synchronously throughout the route to increase the road's capacity and ensure traffic safety.

According to the Center, the repair and renovation scope is from km4+900 to km12+900 and there will be 236 affected trees that will need to be relocated. Therefore, this unit will uproot and replant 48 trees (tamarind, ironwood) and cut down 188 old, poorly growing trees including camphor and royal poinciana.

In addition, the renovation of the lawn median strip will be continuous, 2m wide on average and planted with trees.

The renovation and repair of Vo Van Kiet Street has started and is expected to be completed in mid-September 2024.

Spending more than 12,000 billion VND, Binh Duong will have a chain of waterway cargo ports
Spending more than 12,000 billion VND, Binh Duong will have a chain of waterway cargo ports

Ms. Nguyen Thi Giang Huong
Nhon Trach District People's Council holds extraordinary meeting regarding the case of the Chairman of the People's Committee being scammed of 170 billion VND

Heavy rain in Ho Chi Minh City this new week
Heavy rain in Ho Chi Minh City this new week

Woman tortured like in medieval times; Dong Nai disciplines 2 female district leaders
Woman tortured like in medieval times; Dong Nai disciplines 2 female district leaders

District Chairman lost 170 billion VND and was removed from the position of Deputy Secretary of Nhon Trach District Party Committee
District Chairman lost 170 billion VND and was removed from the position of Deputy Secretary of Nhon Trach District Party Committee

According to Dan Viet



Source: https://tienphong.vn/chat-ha-188-cay-xanh-de-mo-rong-lan-xe-may-tren-dai-lo-dong-tay-tphcm-post1647335.tpo

Comment (0)

No data
No data

Same tag

Same category

Same author

Image

Heritage

Figure

Business

Developing community tourism in Ha Giang: When endogenous culture acts as an economic "lever"
French father brings daughter back to Vietnam to find mother: Unbelievable DNA results after 1 day
Can Tho in my eyes
17-second video of Mang Den so beautiful that netizens suspect it was edited

No videos available

News

Ministry - Branch

Local

Product